2000

  • KDP was established in Jakarta 24 October 2000 as an Indonesian Domestic Private Company.
  • The first project was Rental of Construction Equipment for Central Gathering Station Chevron Pacific Indonesia and as Chiyoda’s Subcontractor for PGR Project PT. Badak NGL Bontang.
  • 2001

  • BPPT for Inverter Supply for BPPT Building (Mechanical & Electrical), Jakarta.
  • IKPT for Warehouse Renovation, Tambun-Bekasi.
  • 2002

  • BHP Steel for Piping, Steel, Civil, Mechanical & Installation work BSI Pain Line Upgrade project, Cilegon-Banten.
  • IKPT-KBR for Housing Renovation Sintuk II – Bontang Kaltim.
  • 2004

  • PT WIKA - Adhi Karya - IKPT, Aromatic Tuban for: Civil Work Package II.
  • PT Kelsri for Aromatic Tuban-TPPI, Piping Work Fabrication and Installation.
  • PT. Karya Internusa for Steel Erection in Kujang 1B Cikampek.
  • PT Hutama Karya for Kujang 1B: Bridge Strengthening work Kalisadang & Cikarang
  • PT. SAS Intern’l for Flare Gas & Hydrogen Recovery Pertamina RU V Balikpapan for Piping, Steel, Civil, Mechanical & Installation Work.
  • Chiyoda’s Subcontractor for Betara Complex Development PetroChina for Ready Mix Concrete and Scaffolding, in Jambi.
  • 2005

  • Pertamina PPGS South Sumatra as IKPT’S Subcontractor for: 14”: Gas Pipeline Merbau-Pagardewa 23 KM and Engineering Services.
  • 2006

  • PT Pertamina EP PPGS South Sumatra as IKPT’S Subcontractor for: Mechanical Installation & Mechanical Work.
  • 2007

  • Amerada Hess, Gresik as IKPT’s Subcontractor for Steel Structure Erection.
  • PT Chandra Asri Petrochemical Revamping Project as IKPT’s Subcontractor for Steel Structure Erection.
  • PT Perusahaan Gas Negara Project , with KSO Moeladi - Adhi Karya - Krakatau Engineering for 24” Gas Pipeline 34 Km Rawamaju-Walahar for Proyek Pengembangan Jaringan Pipa Gas Bumi JABAR
  • Chiyoda Corp for Propane Dryer & Shutdown.
  • 2008

  • PT Krakatau Engineering Subcontractor for 20” Gas Pipeline Installation, Cilegon-Banten.
  • PT TPPI , TTU Tuban Project as IKPT Subcontractor for Civil Work, Civil & Steel Work, Mechanical Equipment.
  • 2009

  • PT Petrokimia Gresik for Pipeline 28” Babat-Gresik Stage IX Relocation & Recondition.
  • 2010

  • PT. MNK Indonesia, IKPT’ Subcontractor for Piping underground and aboveground.
  • 2012

  • PT PERTAMINA EP , Central Processing Plant (CPP) Area Gundih, IKPT - Adhi Karya Subcontractor for Piping Work
  • 2013

  • PT JGC Indonesia Subcontractor for: JCF Plant Modification, Karawang West Java for Structure Work.
  • 2014

  • JGC Indonesia Subcontractor for: Plant site of PT. JCF (JCF Coal Fuel) Karawang West Java for Work Package: Mechanical, Piping, Insulation and Painting Work
  • JGC Indonesia Subcontractor for: Shell LOBP Monas, Marunda Bekasi for Mechanical Erection Work: Rotary Machine, Equipment Package, ABB Package equipment for Blending, Boiler Package, Static Equipment such as pressure vessel, shop fabrication tank, suction heater, EDG.
  • 2019

  • New Polyethylene Reactor Line Project New Swing Plant Of HOPE, LLDPE AND MLLDPE, PT Chandra Asri Petrochemical Cilegon, IKPT-TOYO Subcontractor for Support Steel Structure and Painting Works Support Piping Works Task Force Team To Support Piping Works Rental of Air Compressor 1600 CFM Supply Manpower for Mechanical Task Force
  • PT. Synthetic Rubber Indonesia, Cilegon Banten for Repair slurry tank and piping fabrication and  modification
  • PT. Chandra Asri Indonesia, Contractor for Turn Around of PT CAP
  • PT. Petrokimia Butadine Indonesia , IKPT’s Subcontractor for B1MTBE & EGF project for Piping work
  • PT GEODIPA ENERGY - DIENG, IKPT’s Subcontractor for Temporary Facilities
  • 2020

  • PT. Chandra Asri Indonesia, IKPT’ Subcontractor for NPE shutdown activity.
  • PT. Nippon shokubai Indonesia , IKPT’s Subcontractor for i-III project .
  • PT. Nippon shokubai Indonesia , Rental of Workshop, Heavy Equipment, Genset & Welding machine, Office & Warehouse Container
  • 2021

  • PT. Hutama Karya Subcontractor DED Services HAZOP dan HAZID Study , Open Access RU-VII KASIM – PAPUA
  • PT. SYNTHETIC RUBBER INDONESIA. Butadine By-Pass Facility – BEST CONTRACTOR 2021.
  • PT. LINDE INDONESIA. Evaporator Line, By-Pass Valve, Modif. Valve & Repair crack join, Lift dismantling.
  • PT. SYNTHETIC RUBBER INDONESIA. Butadine Column Antipop Improvement
  • PT. SYNTHETIC RUBBER INDONESIA. Recycle Acid Waste Project
  • PT. Chandra Asri Indonesia, IKPT Equip’t, Materials supply, Manpower and equip’t for Turn Around & Maintenance PP
  • PT. SMELTING / IKPT, Tempfac for Sulfuric Acid.
  • 2022

  • PT. SYNTHETIC RUBBER INDONESIA. Dry Seal Evolution
  • PT. SRI. DUPLEX-2 Stripping Spool Material Supply
  • PT. LINDE INDONESIA. Piping work, Platform, Handrail Maintenance,
  • PT. SRI DUPLEX-2 Stripping Fabrication & Installation – QUALITY AWARD 2022.
  • PT. SRI Stripping DUPLEX-3 Fitting Material Supply
  • ;